Bonded Topping Slab Construction in China

March 1, 2012

Bonded Topping SlabCoGri China Co., Ltd has recently completed construction of a 8,000m2 Bonded Topping Slab to the 2nd Phase of VNA warehouse construction for a leading Korean manufacturer of house ware products.

The first phase was completed by CoGri China in 2011. The 8,000m2 floor included 750m of VNA aisle length which was required to be constructed to TR-34 Superflat.

The floor was tested and certified to be in full compliance with the TR-34 Superflat specification without any remedial grinding being required – a big achievement considering the challenges faced with concrete quality and supply problems which included 3 different ready mix concrete suppliers being used during the duration of the project.

Kevin Dare, CoGri Group MD has also been visiting Shanghai to meet with key personnel at an Asian Regional Meeting to discuss expansion plans in the continent.

Free Advice

For a site visit or advice on the best solution, contact the experts.

Get In Touch Today

Have you got a flooring problem?

Whatever operational problems your warehouse floor is causing, CoGri Middle East can provide the most appropriate solution.

Global warehouse and industrial floor solution specialists

Find Out More